El-Gabal El-Asfar Village waste water upgrade

Descripition
Performing the full network of pipes including two undercrossing with pipes of diameters ranging between 2″ and 2000 mm.

Scope of work
Full site supervision and recommendations for shoring and dewatering.

Client
Found. Eng.

Leave a Reply

copyrights 2011, Active Brains Consulting Group. All Rights Reserved.      Designed by Vigor-Studio
E-Mail | FTP